Public LEI record · Global LEI Index

Spain

PARQUE EOLICO SIERRA DEL MADERO SA

CALLE RIBERA DEL LOIRA, NUM. 60, MADRID, 28042, ES

Legal Entity Identifier 549300ZVPRL1WY1FHI61
Entity status
Active
LEI status
Lapsed
Policy conformity
Non-conforming
Reference data
Register-verified
Next renewal
4 Mar 2024
LEI Issuer
London Stock Exchange
Reactivate and transfer this LEI Reactivation keeps the same identifier. A transfer changes which LEI Issuer manages the record; the LEI code and its reference data do not change.

Record snapshot

The Legal Entity Identifier for PARQUE EOLICO SIERRA DEL MADERO SA is 549300ZVPRL1WY1FHI61. It has lapsed and has not been renewed.

PARQUE EOLICO SIERRA DEL MADERO SA is a Sociedad Anonima formed in Spain, registered as SO-1287-8 with Commercial Registry, Spain. The LEI was registered on 21 Apr 2021. At its last validation on 5 Mar 2024, all of its Level 1 reference data was confirmed against Commercial Registry, Spain. It reports ENEL - SPA as its ultimate parent. London Stock Exchange maintains the record.

A lapsed LEI is publicly visible and may block derivatives reporting, client onboarding and settlement until it is renewed. Reactivation keeps the same identifier.

Record lifecycle

Lapsed since 5 Mar 2024.

First LEI registered on 21 Apr 2021, with at least 2 renewals recorded. It lapsed on 5 Mar 2024 and has not been renewed in the 3 years since.

21 Apr 2021 LEI issued Two renewal marks Each mark is a renewal that completed 4 Mar 2024 Renewal was due

Registered entity Level 1 data

Legal name
PARQUE EOLICO SIERRA DEL MADERO SA
Legal form
Sociedad Anonima 5RDO
Jurisdiction
Spain ES
Registration
Registered at Commercial Registry, Spain RA000533. Registration number SO-1287-8
Entity created
31 Dec 2016
Legal address
CALLE RIBERA DEL LOIRA, NUM. 60, MADRID, 28042, ES
Connected identifiers
QCCQES5Q0UAB2 S&P Capital IQ131346712 Other identifiers recorded against this LEI.
Securities
Not recorded No ISIN is mapped to this LEI in the ANNA and GLEIF ISIN-to-LEI file. That records the absence of a mapping, not the absence of securities.

What this record’s status means

Reference data
Register-verified GLEIF records this as fully corroborated. At its last validation, all of the entity's Level 1 reference data was verified against an authoritative public source.
Policy conformity
Non-conforming The registration has lapsed. Renewing it clears the flag.

Changes to this record

  1. Registration status changed from Issued to Lapsed.

Show 12 earlier changes
  1. Registration status changed from Pending archival to Issued.

  2. Renewed. The next renewal date is now 4 Mar 2024.

  3. Management of this LEI transferred from GMEI Utility a service of BED B.V. to London Stock Exchange.

  4. The legal address was updated.

  5. The headquarters address was updated.

  6. Registration status changed from Pending transfer to Pending archival.

  7. Registration status changed from Issued to Pending transfer.

  8. The headquarters address was updated.

  9. Renewed. The next renewal date is now 4 Mar 2024.

  10. Renewed. The next renewal date moved from 15 Mar 2023 to 4 Mar 2024.

  11. Renewed. The next renewal date moved from 16 Apr 2022 to 15 Mar 2023.

  12. The LEI was registered and first published to the Global LEI Index.

Ownership Level 2 data

  1. Ultimate parent
  2. Direct parent
  3. This entity

    PARQUE EOLICO SIERRA DEL MADERO SA

    ES · 549300ZVPRL1WY1FHI61

    Active

  4. Below
    0 Direct subsidiaries
    0 Ultimate subsidiaries

    The chain ends here. No other entity reports PARQUE EOLICO SIERRA DEL MADERO SA as its parent, so the count is a stated zero rather than data still to arrive.

Level 2 data records who consolidates this entity. A reported relationship, or a reported reason for the absence of one, both satisfy the standard. Only a record carrying neither is incomplete.

Where this data comes from

Source registry

Commercial Registry, Spain

Validated against

Commercial Registry, Spain

Maintained by

London Stock Exchange

Published in

The GLEIF Global LEI Index. This record last updated 5 Mar 2024

PARQUE EOLICO SIERRA DEL MADERO SA

This LEI has lapsed. Publishing it signals reference data that has not been revalidated. Renew it first. Reactivate and transfer this LEI

Add this schema to your homepage. Replace the two example.com values with your own homepage address before publishing.

How to use this

Reference data from the GLEIF Global LEI Index, as published on 5 Mar 2024.